358 fence installation starts with a coordinated drawing, not the first post hole. Dense mesh panels are supplied to defined dimensions, while the fence line must accommodate corners, slopes, gates and changing ground conditions. Small setting-out errors accumulate across a long run and can leave the final bay impossible to close with standard components.
This guide explains the installation decisions a buyer should resolve with the contractor and designer. It supports an approved site method statement; it does not replace the structural design for posts, foundations or anchors. Review the available 358 security fence system components before finalizing the bill of materials.
On this page

1. Establish the fence line and finished levels
Mark the legal boundary, corners, gate openings and start and end points from the site information. Confirm that access for drilling, lifting and later maintenance is available. Identify buried services before excavation and coordinate the work with the responsible site team.
Survey finished ground levels along the actual line. Existing ground may change when kerbs, paving, drainage or landscaping are completed. Record the level used to establish panel clearance, rather than leaving the installer to follow uneven temporary ground.
Divide the line into runs between fixed points. A drawing should show the number of full bays, any special closing bay, and how the connection turns at each corner. Confirm whether the stated bay dimension is post centre-to-centre, clear between posts, or panel width. Those dimensions are not interchangeable.
| Before setting out | Information to confirm |
|---|---|
| Straight runs | Start and end coordinates, bay module and closing detail |
| Corners | Post type, connection direction and panel offsets |
| Ground | Finished level, required clearance, drainage and erosion provisions |
| Gates | Clear opening, movement envelope, operator space and adjacent posts |
| Access | Installation side, lifting route, delivery staging and maintenance access |
2. Select embedded or base-plated posts
Embedded posts extend into a designed foundation. The post length therefore needs to accommodate panel height, the top connection and the required embedment. Base-plated posts connect to a designed concrete element through a plate and anchors. Their appearance can be similar above ground, but the load paths and construction checks differ.
For embedded posts, confirm the foundation geometry, soil assumptions, concrete requirements, setting tolerance and required curing period before panels impose loads. Do not treat a generic hole dimension as suitable for every height. Tall panels, exposed locations, toppings and weak ground can materially change the support requirement.
For base plates, check the concrete thickness and condition, reinforcing constraints, plate level, anchor type, hole pattern, embedment and edge distances against the engineered detail. A kerb or thin pavement is not automatically an adequate structural support. Follow the specified anchor installation procedure and retain the required installation records.

ASTM F3204 provides guidance on designing welded-wire security fence systems. Its system approach is useful when coordinating the mesh, supports and site conditions; it does not give one universally suitable foundation for a product name.
3. Trial-fit the actual connection
Before repeating the installation along a long run, assemble one representative bay with the delivered panel, posts, bars or clamps and fasteners. Verify the panel overlap, hole alignment, washer arrangement and tool access. Use the approved fastener specification and tightening procedure.
A flat panel and a bent panel can sit differently against a post. The clamp must contact the intended wires without crushing the mesh or bearing only on a bend. Where a continuous bar is used, check its alignment and whether adjacent panels share the bar. Where individual clamps are used, follow the specified number and positions.
Confirm which side needs to remain accessible for installation and future maintenance. A tamper-resistant nut is useful only when its assembly and service method are understood. Do not substitute a convenient hardware-store fastener for the specified assembly without approval.

4. Follow a controlled installation sequence
- Receive and identify the components. Compare package labels with the drawing and inspect transport condition before separating parts by run.
- Set out fixed points. Establish corners, gate posts and run ends, then check the available length against the bay schedule.
- Install the support system. Use the approved foundation or anchor method, maintaining alignment, level and plumb.
- Verify a sample bay. Check panel fit and the resulting post module before completing repetitive work.
- Mount panels in the specified orientation. Support them safely while installing the full fixing arrangement.
- Complete fasteners and caps. Apply the stated tightening procedure and verify that all scheduled components are present.
- Install gates and authorized accessories. Coordinate separate gate loads, wiring and topping details.
- Inspect and hand over. Record dimensions, repairs, outstanding work and maintenance information.
A temporary alignment check is not the final fastener inspection. Mark completed bays on the site schedule so missing clamps, loose assemblies or unfinished caps are not hidden by rapid progress. Where tightening requires a documented value, use the specified equipment rather than guessing from how the nut feels.
Protect coated surfaces during handling. Lift and support panels using appropriate equipment and avoid dragging them across concrete or abrasive ground. Keep packing material at contact points until the panel is ready to position, while ensuring no temporary packaging remains trapped in a structural connection.
5. Resolve slopes and changes of level
A welded panel does not behave like a flexible chain-link fabric. On a sloping boundary, a stepped layout may create a changing gap below each panel. A raked or specially shaped arrangement may need purpose-made panels or a different approved detail. Confirm the approach before manufacturing.
Assess the largest ground gap, not just the average gap along a bay. Drainage channels, local depressions and the inside of a stepped corner can leave discontinuities. Use the project’s ground-interface design to address them without obstructing required drainage.
Cutting a panel on site changes its edge arrangement and exposes cut surfaces. Obtain an approved cutting and repair detail where modification is permitted. A newly cut edge still needs a compatible fixing method; coating repair alone does not solve missing attachment points.
6. Coordinate gates and accessories early
Reserve the actual clear gate opening and the movement space for the gate leaf, hinges or sliding system. The fence bay beside a gate should not be expected to carry gate loads unless the support design specifically allows it. See our 358 fence gates and security integration guide for the interface schedule.
Razor wire, spikes, electric security fencing or detection equipment require their own approved details. Their brackets, cables and maintenance access should be shown before posts are ordered. Site-specific permissions, electrical design and operational requirements belong with the responsible qualified team.
Do not attach privacy screens or advertising boards to a completed fence without checking the changed wind loading. Dense infill changes the demand on posts and foundations even when the original mesh remains intact. The original fence drawing should record any permitted accessories.
7. Inspect the finish after installation
Check panel edges, clamp contact areas, bolt holes and lifting points for coating damage. Record significant damage and use the agreed repair procedure for the coating system. A cosmetic colour match alone does not demonstrate restoration of the zinc protection or the topcoat performance.
Remove metal drilling debris and installation dirt without using an incompatible cleaner. Check that post caps are seated and any designed drainage or vent features remain functional. Do not seal holes or openings simply because they appear unfinished; first identify their purpose on the fabrication drawing.
For coating selection and repair documentation, refer to the 358 fence coatings guide. For the component checks that should happen before shipment, use the factory inspection checklist.
8. Make the handover measurable
Walk the entire line with the installer and the owner’s representative. Check continuity at corners, gate interfaces and the ground; compare post alignment, panel orientation and fixings with the drawing. Photograph representative bays and every agreed deviation, then record how remaining items will be closed.
| Handover item | Evidence to retain |
|---|---|
| As-built configuration | Run layout, special bays, gate locations and approved changes |
| Connections | Fastener completion and specified installation records |
| Supports | Relevant foundation or anchor records and inspection sign-off |
| Finish | Damage survey, repair locations and approved repair materials |
| Operation | Gate checks, accessory commissioning and maintenance instructions |
Arrange periodic inspections appropriate to the site. Inspect again after vehicle contact, severe weather, adjacent excavation or changes to attached equipment. A useful maintenance record identifies a bay and component so replacements can be ordered without re-measuring the entire fence.
358 fence installation questions
Can we use the panel width as the post spacing?
Only if the approved connection drawing defines that relationship. Trial-fit one bay and verify the centre-to-centre module before repeating it.
Are base-plated posts always easier to install?
They can simplify some sites, but only where the supporting concrete and anchors suit the design. The existing surface must be assessed first.
Can a standard panel follow a steep slope?
Do not assume it can rack like woven mesh. Use an approved stepped, raked or special-panel arrangement and check the resulting ground gaps.
Should damaged powder coating just be painted over?
Use the agreed repair method for the actual zinc and topcoat system. Record the damage and confirm whether the repair is acceptable or the component should be replaced.
Send the layout and installation requirements to coordinate panels, posts and connection parts before shipment.