A 3D fence installation checklist should turn an approved fence system into a coordinated site plan. The panel width alone does not establish post centers; panel height alone does not establish foundations. Resolve the layout, quantities, trial bay and inspection points before the installation crew starts the complete run.
This checklist is for contractors, distributors preparing installation packages and project buyers checking delivery readiness. Our 3D fence posts, clips and fixing systems covers component selection. The checks below carry that selection through setting out, delivery, installation and handover.
HUACAN / WIRE MESH DEPOT can supply 3D fence panels with matching posts and fittings. Use the approved layout, foundation design and fixing instructions for the work. The commercial post-length examples identify supplied configurations; they do not replace a project foundation design.

Use the 3D fence installation checklist by work stage
| Stage | Check before proceeding | Record to keep |
|---|---|---|
| Before purchase | Boundary layout, levels, support conditions, gates and privacy requirements | Approved layout and component schedule |
| Before foundations | Post roles, clip orientation, bay setting and foundation details | Trial-bay result and set-out approval |
| At delivery | Panel/post identification, quantities, hardware packs and damage | Delivery reconciliation and photographs |
| During installation | Post alignment, panel level, connection fit and specified fastening procedure | Run-by-run inspection record |
| Before handover | Complete fittings, finish condition, caps, clearances and outstanding defects | Completed punch list and replacement-parts reference |
Assign a person to close each stage before the next activity makes corrections expensive. A trial bay is particularly valuable before a whole run of post holes or base-plate anchors is fixed. Keep its verified setting-out dimensions with the drawing used by the crew.
A component takeoff for separate fence runs
As a simple example, an open straight run with 12 full panels normally requires 13 post positions. A separate open run with eight full panels normally requires nine. The combined requirement is therefore 20 panels and 22 post positions before accounting for special posts, gates or shared corner details.
If a packing quotation contains 20 commercial sets, each with one panel and one post, two additional posts are still needed for this illustrative layout. Hardware must also be counted by its actual connection arrangement. A clamp shared at a line post and separate end connections cannot be treated as identical quantities without checking the assembly.
Do not automatically divide an entire boundary length by nominal panel width and round up. The finished module includes the post-and-clip relationship, and gates, corners and terminal gaps consume part of the run. Resolve the end bay and any cutting or custom-panel requirement on the layout before ordering.
Close the handover record
Record the panel model and drawing revision, post type, cap type, clip and fastener identification, finish and approved repair method. Attach photographs of the trial bay and unusual corner or level-change details. Note where spare accessories are stored and identify any outstanding corrective action.
A future replacement order can then name a part rather than describe “the green fence.” That makes this 3D fence installation checklist useful after construction as well as during the first installation.
1. Record the fence line and site conditions
Walk the boundary and identify straight runs, changes in level, corners, gate openings and terminal positions. Confirm the finished ground level and the required bottom clearance. Check for underground services before excavation or drilling and establish the permitted working area.
A 3D welded panel is a rigid formed component. On sloping ground, the installation may require stepped bays, approved changes in panel level or specially detailed sections. Do not assume every panel can be raked to follow a slope without changing the mesh or connection geometry.
Prepare a component schedule by run. Count line posts separately from ends, corners and gates. For a simple open run, ten panels normally require eleven post positions. A corner shared by two runs and a separately supported gate change the count, so the total should come from the layout.
| Site information | Why it affects the order |
|---|---|
| Ground or concrete support | Determines the appropriate embedded or surface-mount arrangement |
| Level changes | Affects panel stepping, post length and clip positions |
| Corners and gates | Changes post roles, hardware and component quantities |
| Exposure and privacy infill | Affects the support and foundation design |
| Access and unloading | Affects handling, storage and the order of installation |
For a distributor, the useful output is a consistent assembly drawing that installers can follow. For a project contractor, it is a layout and schedule that coordinate with the foundation and gate details. Both should use the same panel model and revision as the purchase order.
2. Select the post profile and wall thickness
Our 3D fence posts are commonly made from galvanized tube. Square, rectangular and peach profiles are widely used, and the catalog also lists round posts. The outside dimensions are only part of the specification: wall thickness, total length, coating, cap and connection faces must also be stated.
The most common square-post size in our supply practice is 60 × 60 mm. Frequently selected wall thicknesses are 1.5, 1.6 and 1.8 mm, with common customization from 1.2 to 2.5 mm. The broader catalog contains additional profiles and thicknesses:
| Post type | Catalog sizes | Catalog wall options | Catalog cap material |
|---|---|---|---|
| Square tube | 50 × 50; 60 × 60 mm | 1.5–4.0 mm | Plastic or metal |
| Rectangular tube | 60 × 40; 80 × 40 mm | 1.5–4.0 mm | Plastic or metal |
| Peach profile | 50 × 70; 60 × 90; 70 × 100 mm | 1.2 or 1.5 mm | Plastic |
| Round pipe | 48; 60; 75 mm outside diameter | 1.5–3.0 mm | Plastic or metal |

The published range does not mean every post suits every fence height or loading condition. The selected section, orientation, spacing, fixing and foundation need to work together. In particular, identify end, corner and gate posts rather than automatically assigning the line-post detail to every position.
For rectangular posts, the orientation matters because the two outside dimensions are different. Mark the fence face on the drawing and place the prepared fixing holes on the correct side. A post rotated by 90 degrees may no longer match the intended connection or structural arrangement.

3. Choose embedded or base-plate posts
Embedded posts for soil-based installations
Embedded posts extend below finished ground level. They are often selected for soil sites and uneven or hilly ground. The embedded portion is installed in an excavated location with the approved backfill or concrete footing. Where the design allows soil backfill, the method must still provide the required stability; concrete can provide a stronger anchorage arrangement when appropriately designed.
For a 2030 mm panel, our common supply examples use a 2500 or 2600 mm post, associated with roughly 500–600 mm below-ground allowance. For a 1030 mm panel, common post lengths are 1300 or 1500 mm, associated with roughly 300–500 mm below-ground allowance.
These are nominal assembly examples from our production practice. Panel and post tops may not align exactly, and ground clearance changes the geometry. Confirm the actual below-ground length on the assembly drawing. Soil conditions, wind, frost and the project foundation design can require a different arrangement.

Base-plate posts for an existing concrete support
For the surface-fixed arrangement described here, use posts with welded base plates on a suitable existing concrete foundation, wall or plinth. The plate is fixed with the specified concrete anchors; expansion anchors are a common option where the design and concrete permit them.
Our typical supply examples pair a 2030 mm panel with a nominal 2000 mm post, and a 1030 mm panel with a nominal 1000 mm post. The panel position, bottom clearance, cap and clip locations must be coordinated. The small difference between the nominal post length and panel height should be shown in the drawing, not left for the installer to guess.
A level concrete surface is not sufficient evidence of anchorage capacity. Check the concrete thickness, condition, edge distance, anchor spacing and selected anchor embedment. Thin paving units and an unknown slab should not be treated as a designed foundation. Hilti’s anchor-design guidance identifies these dimensions as important limits on anchor capacity.

4. Choose the correct clips for the post system
Three common fixing choices in our production notes are six-claw clips, wrap-around clamps and eight-claw clips. They are not interchangeable simply because they all hold welded wire. The clip must match the post section, wire position and the direction in which the panel is mounted.
| Fixing | Main characteristic | Planning requirement |
|---|---|---|
| Six-claw clip | Quick installation and a firm connection at prepared positions | Rivet nuts and fixing positions must be prepared in the post |
| Wrap-around clamp | Clamps around the post without drilling it; can be moved vertically before tightening | Match the clamp to the section and provide the correct corner or end arrangement |
| Eight-claw clip | Similar fixing principle to a six-claw clip; commonly used on the post side | Confirm side or front mounting and the matching hole pattern |
Wrap-around clamps are particularly useful where the panel level must be adjusted or where the layout contains many corners. That flexibility comes from the connection arrangement; it does not mean the rigid panel itself can bend freely to fit any terrain.
Six-claw clips are a convenient option when the factory-prepared fixing locations align with the panel. If the installed post height changes, check that the clip positions still suit the panel before concreting the post. Moving a panel later is harder when its fasteners rely on fixed threaded locations.
Eight-claw clips can be used on the front face as well as the side where the matching detail permits it. State the intended face in the order. A side-mounted panel and a front-mounted panel can require different post-center dimensions.

Confirm the number of connections from the approved assembly. A generic instruction such as “three clips per post” can be wrong for a taller panel, an end post, a corner or a different fixing system. Count bolts, nuts, washers and any security features as part of the same schedule.
5. Assemble a trial bay before fixing all post positions
A trial bay is one of the most useful checks in 3D fence installation. Assemble one panel between two representative posts with the actual clips and caps. Set the intended bottom clearance and panel orientation, then measure the resulting post centers.
Check that the clips engage the correct wires without forcing the panel out of shape. Verify that the fasteners can be reached with the installation tools and that the chosen security arrangement works from the intended side. Where two panels share a post, test that connection as well.
For a corner or step in level, assemble the relevant detail before repeating it across the site. The additional time is small compared with relocating a series of incorrectly set posts.
The trial also helps reconcile the commercial and installed dimensions. A 2500 mm panel, a 60 mm post and a particular clip do not create a reliable bay dimension merely by adding the first two numbers. The overlap and location of the connection must be included.
Record the accepted dimensions and photograph the completed bay. Give the installation team that reference together with the component schedule. Do not mark out the whole perimeter from an assumed panel width while a different clip arrangement is being supplied.
6. Set and secure the posts to the approved design
For embedded installation, set out the post positions, excavate to the specified foundation dimensions and maintain the intended line and level. Brace the posts while the footing is formed. Keep prepared fixing faces and holes oriented correctly, and allow the concrete to reach the required strength before loading it with the completed fence.
For base plates, inspect the support and mark the holes from the actual plate. Drill, clean and install the selected anchors in accordance with their instructions. Use the specified embedment and tightening procedure. Avoid substituting an arbitrary expansion bolt because it happens to fit the plate hole.
Confirm any required leveling or grout detail for the base plate. A plate supported on an uneven surface or an unintended stand-off changes the connection arrangement. The completed post should be aligned and supported as designed before panel fixing begins.
Check a small number of installed posts against the trial bay, then continue the run. This catches errors in spacing or orientation early. Keep gates and movement joints coordinated with their own details rather than forcing the standard panel connection across every interruption.
7. Attach the panels and fit the post caps
Handle panels with suitable gloves and protect the finished coating during lifting. Support the panel at the required height, engage the matching clips and install the fasteners without immediately pulling one connection tight enough to distort the panel.
Once the panel is aligned and all its connections are correctly engaged, tighten the fasteners using the requirements for the selected fitting. Confirm that the next panel can be connected at the shared post without prying or bending wires to make it fit.

The pictured catalog sequence illustrates one particular clip assembly. It should be read with the supplied fitting, not applied as an instruction for every clip family. The correct order and fastener access can differ between six-claw, eight-claw and wrap-around connections.
Metal and plastic caps
Metal rain caps are welded to the post before powder coating, so the cap and post are finished together. This produces a firm permanent closure. A welded cap is not a readily replaceable part; changing it involves fabrication and coating repair.
Plastic caps are fitted during project assembly. They are easy to install and can be replaced later. Match the cap to the actual post profile and wall thickness, since those details affect the internal opening and fit.
| Cap style | Typical projection above the post in our notes | Practical check |
|---|---|---|
| Flat cap | Approximately 10 mm | Check the visible top line and seating |
| Pyramid cap | Approximately 30 mm | Allow for the higher profile when comparing installed height |


Caps help keep rain and debris out of the open tube. Inspect them at handover and replace missing plastic caps with the correct component. The cap is a small item, but omitting it leaves the supplied post system incomplete.
8. Inspect the complete fence and plan any privacy infill
Walk the installed run from both sides. Check line, level, panel orientation, bottom clearance, clip engagement, fasteners, caps and visible coating damage. Confirm that the ends, corners and gate interfaces match the approved arrangement.
Minor handling damage should be identified and repaired using the method specified for the coating system. A casual coat of unrelated paint is not automatically an equivalent repair. Record significant defects and resolve them before handover.
If privacy inserts are planned, assess them before treating the open-mesh installation as complete. Reducing the open area changes wind loading, which affects the posts, clips, base plates and foundations. A fence suitable in its open configuration may need a different support design when screened.
Our 3D fence privacy slats need the correct finished mesh clearance and bend geometry. The existing guide to installing fence slats covers their assembly after the fence system has been checked.
Keep the final component schedule and a small supply of replacement fittings. HUACAN normally packs clips, caps and security screws in cartons and usually includes additional accessories free of charge as spares. Record what has been received and retain matching items for future maintenance.
Protect the components between delivery and installation
Inspect the delivery before removing all packaging. Check panel and post counts, accessory cartons and visible transport damage against the packing list. Keep the model labels with each stack so similar panels with different heights or fold arrangements are not mixed.
Place pallets on stable supports and avoid concentrating loads on the raised V bends. Open the packing in a controlled sequence so loose panels cannot fall as the restraints are removed. Handle the posts and panels without dragging their coated surfaces against concrete or each other.
For a large 3D fence installation, issue fittings by run or work area using the approved component schedule. That makes missing parts easier to identify and prevents one crew from using a corner fitting where a line connection was intended. Keep spare caps and security fasteners separate from the installation allocation.
At handover, record the actual panel model, coating system and fitting arrangement. A photograph of the completed trial bay and a short parts list are useful when a damaged panel needs replacement. This gives future maintenance work a defined reference instead of restarting the 3D fence installation decisions from a general product name.
3D fence installation checklist FAQ
Can I set posts exactly 2.5 m apart for 2.5 m panels?
Only when the approved assembly uses that center spacing. Verify the actual panel-to-post connection in a trial bay before marking out the complete run.
Which clip is useful on uneven ground?
A wrap-around clamp allows vertical adjustment before tightening and does not require pre-drilled post holes. It can simplify the connection, but panel stepping and the foundations still need a coordinated design.
Can base-plate posts be installed on any concrete surface?
No. The support must have suitable dimensions and condition for the selected anchors and loads. Review concrete thickness, edge distance, anchor spacing and embedment.
How deep should a 3D fence post be buried?
Use the project foundation design. Our common post-length examples explain available supply arrangements, but soil, exposure, frost, panel size and any privacy screening can change the required embedment and footing.
Can HUACAN supply matching posts and accessories?
Yes. Send the layout, panel model, post installation method and any corner or gate details. We can quote the matching panel, post, clip and cap schedule.
Prepare the installation package before shipment
For a smoother 3D fence installation, approve the component drawing and trial assembly before the order leaves the factory. Send WIRE MESH DEPOT your fence layout so we can review the supplied panel and fixing arrangement with you.