Airport security fencing must be selected as part of an operating perimeter. The mesh establishes a physical boundary, but access gates, ground interfaces, drainage, inspection routes and the surrounding layout also affect the outcome. A narrow-mesh 358 panel can be one component of that design; the product name alone is not an airport approval.
This guide is for project buyers, contractors and importers preparing an airport fence enquiry. It focuses on the information needed to specify and purchase a coordinated system. It does not replace the airport operator’s security brief, local aviation requirements or the approved civil design.
On this page

1. Define the airport security fencing brief
Start by identifying the boundary’s purpose. Airside access control, wildlife exclusion, equipment compounds and landside property boundaries do not necessarily have the same requirements. Record which functions apply to each section of the site. The drawings and bill of materials should preserve those distinctions instead of using one generic fence description everywhere.
The airport operator and design team should establish the required height, permitted toppings, gate arrangements, operational clearances and any specified performance evidence. A procurement team can then ask suppliers to quote that design. If a requirement is unresolved, list it as a design decision rather than asking the supplier to infer an approval from a photograph.
2. Specify actual mesh geometry and wire
For 358 security fence, the familiar nominal pattern is 76.2 × 12.7 mm. The drawing must identify the measurement convention, wire diameters in both directions and tolerances. Confirm the steel diameter before coating. A measurement over the completed finish does not by itself establish the steel core.
Narrow rectangular openings restrict conventional hand and foot access compared with larger mesh patterns. However, the installed perimeter’s performance also depends on panel edges, joints, posts and gates. Avoid substituting a similar-looking mesh without a documented review. The catalogue’s alternative 100 × 15 mm design, for example, is a separate pattern requiring its own approval.
Use the 358 mesh specification guide to develop the material schedule. Identify flat or bent panels, overall dimensions, any special top edge and the selected fixing arrangement. Where several fence heights are needed, assign a separate item code to each.
3. Set height and the ground detail together
Panel height is not automatically the installed barrier height. The finished ground level, panel clearance, post projection and topping arrangement all contribute to the geometry. Show those dimensions on sections and at grade changes. Define how the fence line crosses uneven ground without leaving unreviewed spaces below panels.
The FAA’s wildlife exclusion fencing guidance highlights ground gaps, gates, burrowing protection and inspection as parts of airport wildlife control. Its recommendations address particular US wildlife conditions; they do not make 358 mesh mandatory or certify a supplier’s fence.
For a specific project, the operator and civil team should determine the required ground interface, including any plinth, skirt or other approved measure. Suppliers need the finished detail so posts and panels can be coordinated with it. Do not order a standard panel height and expect the installation crew to resolve all ground conditions on site.

4. Coordinate access gates with the fence line
Vehicle and pedestrian openings should be scheduled separately. Include clear opening dimensions, operating direction, required hardware, access-control interfaces and the relationship between the gate leaf and adjacent fence. Powered gates also need coordination with the equipment supplier and the operator’s safety procedures.
Check whether the gate infill matches the specified mesh and whether the frame and support posts have been designed for their different loads. A gate leaf is a moving assembly, not an ordinary fence panel mounted on hinges. The gate schedule should also show thresholds, drainage and the applicable ground-clearance requirements.
A practical procurement drawing labels each gate, identifies the matching posts and lists the supplied hardware. This helps the receiving team check completeness before the installation window. Our gate and security integration guide provides a broader coordination checklist.
5. Resolve drainage and service crossings
Drainage channels, culverts, cable routes and service access points need approved perimeter details. These interfaces should maintain the intended boundary function while allowing the drainage or service system to work. The fence supplier needs dimensions and fixing information for any special fabricated pieces.
Record who designs and supplies each interface. A common procurement problem is an item that falls between the fence, civil and electrical packages. A responsibility schedule is useful: it can identify the drawing owner, material supplier, installer and inspection authority for each crossing without exposing operational security details in public documents.
6. Review posts, foundations and topping loads
Fence height, site exposure, soil or concrete conditions, panel geometry and accessories all influence structural design. Toppings and sensor equipment add their own loads and connection requirements. A generic post section or embedment depth from another site should not be copied into an airport order without review.
Confirm post spacing, section, wall thickness, length, base or embedment detail and the selected clamps or fixing bars. Continuous bars and individual clamps have different schedules. Anchor sizes, concrete requirements and edge distances belong in the approved structural details rather than an improvised site instruction.
Where a security topping is required, specify its type, support arrangement and approved position relative to the boundary. The 358 fence topping guide explains the procurement interfaces without treating a topping as a substitute for a complete security design.
7. Test visibility in the actual layout
358 mesh permits views through the perimeter, but “clear view” should not be interpreted as perfect visibility under every condition. Camera angle, posts, bends, background contrast and lighting can affect the image. Confirm that the selected panel and gate arrangement works with the project’s surveillance design.
A sample bay can help the team assess appearance and installation details before approving a large order. If camera compatibility is a requirement, the relevant specialist should define the assessment and acceptance criteria. Product photographs cannot establish a no-blind-spot guarantee for a different airport layout.

8. Match corrosion protection to the location
Exposure near coastlines, industrial areas or de-icing operations can differ substantially from an inland site. Describe the actual conditions in the enquiry and agree a finish system. Define the galvanizing route, required zinc protection, surface preparation, exterior powder grade where used, and the treatment of fabricated edges and attachments.
For maintenance planning, identify compatible repair materials and the records that will be supplied. A colour name and a powder brand do not fully define the coating. Use the galvanizing and powder-coating guide to turn broad finish descriptions into measurable procurement requirements.
9. Build inspection and handover into the purchase
Agree inspection points before production begins. Useful records can include panel dimensions, wire measurements, post sections, weld checks, coating results against the contracted criteria, component quantities and packing photographs. Request documentation for the purchased configuration, not only general company literature.
| Stage | Key decision or check | Useful output |
|---|---|---|
| Design review | Panel, posts, gates and special interfaces match | Approved drawings and bill of materials |
| Manufacture | Dimensions and specified finish are checked | Batch-linked inspection records |
| Dispatch | Parts are protected and counted | Package labels and packing list |
| Installation | Approved details and tolerances are followed | Installation inspection records |
| Handover | Operating and maintenance responsibilities are clear | As-built information and spare-parts schedule |
Plan the shipment around site access and unloading constraints. Long posts, panel pallets and gate assemblies may need different handling. Identify which packages are required first so the installer can sequence the work without repeatedly moving coated components. See the export packing guide for package planning.
Check an operating entrance before accepting the interface
Review a representative gate opening with the airport team and the appointed installer before repeating the detail across the site. Consider the intended vehicle movement, finished road level, water runoff, gate travel and the inspection access needed around the opening. Record which contractor supplies each adjoining component and which drawing controls the interface. This avoids a fence order being technically complete while a road, drainage or gate detail remains unresolved. Include the agreed interface checks in the handover record so maintenance staff can compare later changes against the accepted arrangement.
Airport security fencing FAQ
Is every 358 fence suitable for an airport?
No. The project requirements govern selection. The mesh, supports, gates, ground interfaces and any required evidence must match the approved airport design.
Is there one worldwide airport fence height?
No single height should be assumed across jurisdictions and applications. The operator and design team should define the relevant requirements for the specific boundary.
Can an airport fence include razor wire or electric security equipment?
Only where the project design and applicable requirements permit the selected arrangement. The equipment, supports, access restrictions and maintenance procedures need separate coordination.
What information should a supplier receive first?
Send the specification, layout, sections, gate schedule, finish requirements, quantities and destination. Mark unresolved design points clearly so they are not mistaken for approved details.
Share your airport perimeter specification with WIRE MESH DEPOT for a material and component quotation against the approved scope.